Cultivation Facility Projects

140,000 sq ft. shoe making factory converted into state-of-the-art cannabis cultivation facility.

ValiantGroup_FinalA 2

Photo gallery from beginning to full operation.

Starting from Scratch

After Valiant’s demolition team cleared out the building, our vertically-integrated team of construction workers went in erecting all new walls, new epoxy floors, and sealing every single piece of the building to create a  controlled environment ideal for cannabis cultivation.

Fresh Coats, Inside and Out

All four floors across two buildings, containing a total of 36 rooms throughout all stages: mother rooms, vegetation rooms, flowering room, drying and curing rooms, packaging, commercial grade kitchens, extraction, security offices and several other areas were constructed and sealed far beyond typical industry standards to ensure a mold-resistant cultivation environment.

Finishing the Interior

Each grow room is completely sealed with mold-resistant materials, irrigated and fertigated properly, humidity controlled, temperature controlled, and monitored from a state-of-the-art building management system (BMS) to create a seamless, efficient operation. The facility will house up to 2,500 cannabis plants at a given time. All rooms are monitored for mold and CO2 levels that could damage product in the facility (mold remediation filters and other machines were installed to prevent and contain contamination).

Operations Begin

Valiant continues to innovate and push new industry standards in construction of medical and recreational cannabis cultivation facilities and dispensaries worldwide.

Partners

Contact Us

We will get back to you as soon as possible.

Address:  PO Box 87141, S. Dartmouth, MA 02748

Customer Support:  info@valiant-america.com